# Project Type Project Details Main Contractor Client /END USER Status
1 Electro-Mech Supply, Fabrication and Installation of access platform ZAMIL COOL CARE SABIC-HADEED Completed
2 Electro-Mech Supply , Fabrication and Installation of Structure protection for Kamag Crossing ZAMIL COOL CARE SABIC-HADEED Completed
3 Mechanical works Structure cladding work and construction of gas shelter etc. UHDE ARABIA SIPCHEM Completed
4 Electrical Works Supply & Installation of Power & Control Including Cable Tray Work, Conduit Work, Cable Laying, Termination, Instrument Installation for 30 Different Building in WASIT gas Plant ARAMCO. Package 1, 3 & 4. ZAMIL COOL CARE WASIT ARAMACO Completed
5 WASIT ARAMACO Revamping and expansion of pipe fabrication facility – Site Supervision & Execution SGS-SMS NPC Completed
6 O & M Operation & Maintenance for the District Cooling Plant, ZAMIL, HADEED, SABIC ZAMIL COOL CARE SABIC -HADEED Completed
7 HVAC Works Complete HVAC Works in Various Building including supply of Duct & Duct accessories, installation of all equipment, ducts & duct accessories, Saudi Elastomer Project(SEP) ZAMIL COOL CARE SABIC- PETROKEMYA Completed
8 Const. Complete Construction from Engineering/ Coordination & Approval and complete construction of 3800 Sq. Meter Brasa De Brazil Restaurant in Jubail under Royal Commission Civil, Structural, Electrical, Mechanical, HVAC & Interior MIA Arabia Co. MIA Holding Completed
9 Electro-Mech. Installation of compressed air system and chiller water MINTEK SABIC-HADEED Completed
10 HVAC Works Complete Electro Mechanical Works for the HVAC in Various Building including supply of Duct & Duct accessories, installation of all equipment, ducts & duct accessories, electrical works power & control for SIPCHM, UDHE Arabia Project ZAMIL COOL CARE UHDE ARABIA SIPCHEM Completed
11 Electrical and Civil Modification work in multififunction building and trucker rest room including all electrical , mechanical, civil and finishing works UHDE ARABIA SIPCHEM Completed
12 Civil Work. Civil foundation for fire alarm siren foundation including necessary strengthening of existing foundation AMANCO SABIC-HADEED Completed
13 HVAC Instalaltion of HVAC Package Unit with Assocaited Piping Work, Duting Work, Supply & Instalaltion of VCD’s, Grills & Assocaited Equipments including Testign & Commissioning Land Mark Group Completed
14 Mechical Works Supply and Installation of piping insulation for chiller pipe including aluminum pipe jacketing works ETEC SABIC-HADEED Completed
15 Civil and Mechanical work Civil, Electrical and Mechanical work for chiller water pipe line at admin building majid -Hadeed ZAMIL COOL CARE SABIC-HADEED Completed
16 HVAC Works Supply, Installation & Commissioning assistance for 380 KV Substation HVAC system for SEC in SAFANIYA for ZAMIL Cool care including Square Ducting, Spiral Ducting, Other Equipment except HVAC Unit & DDC panel complete electrical, mechanical & ducting ZAMIL COOL CARE SIEMENS – SAUDI ELEC.CO Completed
17 Electrical Works Supply & Installation of HVAC Power & Control Including Cable Tray Work, Conduit Work, Cable Laying, Termination, Instrument Installation for 4 Different Building in SADARA L & T Project ZAMIL COOL CARE L& T – SADARA Completed
18 Const. Complete Renovation /Expansion of from Engineering/ Coordination & Approval and complete construction of 950 Sq. Meter Taya Restaurant in AL KHOBAR including Civil, Structural, Electrical, Mechanical, HVAC & Interior MIA Arabia Co. MIA Holding Completed
19 HVAC Works Replacement of AHU in Billet Caster Plant Hadeed ZAMIL COOL CARE SABIC -HADEED Completed
20 Mechanical Works Installation of FCU with Internal Piping, Fitting Installation, Equipment Installation, Valves & Fittings Installation & Testing inside HADEED Steel Plant for ZAMIL Cool Care ETS 03 FCU INSTALLATION & PIPING (RFI # FGT – MECH- 024) ZAMIL COOL CARE SABIC – HADEED Completed
21 Mechanical Works Construction of Panel room with SANDWITCH panels for the ETS Control Room inside Hadeed Steel Plant, ZAMIL Cool Care ZAMIL COOL CARE SABIC – HADEED Completed
22 Mechanical Works Installation of FCU with Internal Piping, Fitting Installation, Equipment Installation, Valves & Fittings Installation & Testing inside HADEED Steel Plant for ZAMIL Cool Care ETS 11 FCU INSTALLATION & PIPING (RFI # FGT – MECH- 026) ZAMIL COOL CARE SABIC – HADEED Completed
23 Mechanical Works Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care ( SHUT DOWN WORK ETS 03 TERTIARY AREA BYPASS LINE (RFI # FGT – MECH- 016)) ZAMIL COOL CARE SABIC – HADEED Completed
24 Mechanical Work Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant SHUT DOWN WORK AT DIFFERENT LOCATIONS ZAMIL COOL CARE SABIC – HADEED Completed
25 Mechanical Work Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant SHUT DOWN WORK AT DIFFERENT LOCATIONS ZAMIL COOL CARE SABIC – HADEED Completed
26 Mechanical Works Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant SHUT DOWN WORK AT DIFFERENT LOCATIONS ZAMIL COOL CARE SABIC – HADEED Completed
27 Mechanical Works Fabrication & Installation of Walk Ways, Platform & Ladders for the District Cooling Plant Equipment inside the Bldg & out side for ZAMIL District Cooling Plant inside Hadeed Steel plant, SABIC ZAMIL COOL CARE SABIC – HADEED Completed
28 Mechanical Works Construction of Panel room with SANDWITCH panels for the ETS Control Room inside Hadeed Steel Plant, ZAMIL Cool Care ZAMIL COOL CARE SABIC – HADEED Completed
29 Mechanical Works Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care ( ETS 13) ZAMIL COOL CARE SABIC – HADEED Completed
30 Mechanical Works Fabrication, Welding & Installation of LPG Piping, Equipment Installation & Installation of SNG system with related electrical Power & Control Works National Gas, OMAN Completed
31 Mechanical Works Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care ( ETS 4-17-19-20) ZAMIL COOL CARE SABIC – HADEED Completed
32 Mechanical Works Fabrication, Welding & Installation of Complete Piping for the Chillers & Accessories for Chillers for District Cooling Plant Expansion Project for ZAMIL COOL CARE, Hadeed, Sabic Jubail ZAMIL COOL CARE SABIC – HADEED Completed
33 Mechanical Works Various Electro Mechanical Worsk during the Plant Shut Down in Various Process Plant for HADEED EPM HADEED EPM SABIC – HADEED Completed
34 Mechanical Works Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant SHUT DOWN WORK AT DIFFERENT LOCATIONS ZAMIL COOL CARE SABIC – HADEED Completed
35 Electrical Works Complete Electrical Work starting from construction Engineering, Cable Tray Installation, Conduit Installation, Cable Laying MV, LV, Control & Instrumentation, Cable Termination 34.5 KV (CONEX Termination), 13.8 KV, 4.16 KV, 480 Volts, control, Instrumentation & SCADA Works, Earthing Installation, Lighting Power & Sockets, Panel Installation, Transformer Installation, Cable Testing & Hipot Test up to 34.5 KV Cables, Control Cable Loop Checking, Complete works up to PSSR for Electrical, Control, SCADA for ZAMILL COOL CARE, District Cooling Plant Hadeed Steel Plant, SABIC ZAMIL COOL CARE SABIC – HADEED Completed
36 Electrical Works Software Installation, Testing & Commissioning of RO plant for COCOCOLA Plant in Riyadh through ION Exchange India Limited ION Exchange Completed
37 Electrical Works Cable Tray Work, Conduit Installation, Cable Laying, Termination, for HVAC SEC Project in Royal Commission for ZAMIL COOL CARE ZAMIL COOL CARE Completed
38 HVAC & Electrical HVAC & Electrical works in DAREN MALL DAMMAM concept BOSINI – LAND MARK Group MIA Arabia Company Land Mark Group Completed
39 HVAC & Electrical HVAC & Electrical works in ALFANAR MALL AL KHOBAR concept BOSINI – LAND MARK Group MIA Arabia Company Land Mark Group Completed
40 HVAC Supply, Installation of complete Electro Mechanical Works for NDA Project , ZAMIL COOL CARE, SINOPEC – SAUDI KAYAN ZAMIL COOL CARE SABIC –SAUDI KAYAN Completed
41 Mechanical Works Construction of Chiller System with Chiller & Freezer including Engineering, Equipment Supply construction & complete commissioning MIA Holding in AL KHOBAR MIA Arabia Company MIA Holding Completed
42 Mechanical Works Complete Installation of DM Plant including construction engineering, supply of electrical construction materials, piping works, supply of control panel including soft ware development & commissioning, instrumentation works, complete power & control works, all mechanical installation works for DM plant in SAFCO, Sabic for Ion Exchange India Limited ION Exchange SABIC – SAFCO Completed
43 Mechanical Works Fabrication & Supply of ACID measuring tank for DM Plant in SAFCO, SABIC for Ion Exchange India Limited ION Exchange SABIC – HADEED Completed
44 Mechanical Works Fabrication and Galvanizing Installation of Platform ZAMIL COOL CARE SABIC – HADEED Completed
45 Mechanical Works Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care (SHUT DOWN WORK ETS 03 VALVE CHAMBER (RFI # FGT – MECH- 020) ZAMIL COOL CARE SABIC – HADEED Completed
46 Mechanical Works Installation of FCU with Internal Piping, Fitting Installation, Equipment Installation, Valves & Fittings Installation & Testing inside HADEED Steel Plant for ZAMIL Cool Care ETS 05 FCU INSTALLATION & PIPING (RFI # FGT – MECH- 021) ZAMIL COOL CARE SABIC – HADEED Completed
47 LPG SYSTEM Detail Engineering, Supply & Fabrication of LPG Piping, Support Structure, Tank Platform, Installation of Complete Piping & LPG Tanks, Hydro test, Nitrogen Fitting & Pressurization, As Built Drawing, Co-Ordination with GASCO for the Engineering & Installation Approval & Certification and Commissioning of the System for AL BARAK Petrochemical, Yanbhu Through National Gas LLC of OMAN National Gas AL BARAK PETROCHEM. Completed
48 LPG SYSTEM Engineering, Site Management, Co-ordination with Local Authorities for Approvals, Mechanical Electrical Including Piping for the LPG System with five 50 MT LPG tanks & complete Equipment including testing & commissioning in ARCELOR MITTAL Project in JUBAIL II, through NATIONAL GAS OF OMAN LLC National Gas ARCELOR MITTAL Completed
49 LPG SYSTEM Engineering, Site Management, Co-ordination with Local Authorities for Approvals, Civil, Mechanical Electrical Including Piping for the LPG System with five 50 MT LPG tanks & complete Equipment including testing & commissioning in LPG Tank Project in Dammam II, through NATIONAL GAS OF OMAN LLC National Gas Arab Steel Completed
50 LPG SYSTEM Construction of Industrial Gas Factory for Production of Industrial Gas 5000 Sq. meters from feasibility, engineering, construction, commissioning of the plant with set up for successfully operation, Technology Supplier National gas man SAOG, Client Middle East gas Factory MIA Arabia Company MIA Holding Completed
51 HVAC Installation of HVAC Package Unit with Associated Piping Work, Ducting Work, Supply & Installation of VCD’s, Grills & Associated Equipments including Testing & Commissioning SIEMENS Completed
52 HVAC Installation of HVAC Package Unit with Associated Piping Work, Ducting Work, Supply & Installation of VCD’s, Grills & Associated Equipments including Testing & Commissioning Land Mark Group Completed
53 HVAC Installation of 25 Ton Package Unit, Ducting Work, Supply & Installation of VCD’s, Grills Etc for the CITY MAX ARAR 2400 Sq. Meter MIA Arabia Company Land Mark Group Completed
54 Electrical Works Cable Tray Work, Conduit Installation, Cable Laying & Termination for Incoming Cable for Energy Transfer Station, ZAMIL District Cooling Plant, HADEED Steel Plant, SABIC – EST 08 ZAMIL COOL CARE SABIC – HADEED Completed
55 Electrical Works Supply & Commissioning of Power & Control panel with PLC & software program for the DM Plant in SAFCO for ION Exchange India Limited ION Exchange SABIC – SAFCO Completed
56 Electrical Works Complete Electrical Works including Cable Tray Work, Conduit Installation, Cable laying, Panel Installation, Cable Laying, Termination, Instrument Works, Lighting Works, Earthling Installation, Testing of Cables, Loop Checking, Earth Testing, Illumination Test, PSSR all activities for Electrical Power, Control & Instrumentation PSSR for HVAC SYSTEM, ZAMIL COOL CARE for SAUID KAYAN, JUBAIL ZAMIL COOL CARE SABIC – KAYAN Completed
57 Electrical Works Cable Tray Installation, Conduit Installation, Equipment Installation, Cable Laying & Termination for the CCTV & Accesses Control System in MADEN Project in ARAR for THALES TORQUE MADEEN Completed
58 Electrical Works Complete Electrical Works including Cable Tray Work, Conduit Installation, Cable laying, Panel Installation, Cable Laying, Termination, Instrument Works, Lighting Works, Earthing Installation, Testing of Cables, Loop Checking, Earth Testing, Illumination Test, PSSR all activities for Electrical Power, Control & Instrumentation PSSR for Energy Transfer Station, ZAMIL COOL CARE for HADEED District Cooling Plant, Hadeed, SABIC. ( ETS 18) ZAMIL COOL CARE SABIC – HADEED Completed
59 Electrical Works Testing of ETS Incoming Panel – ZAMIL for District Cooling Plant, Hadeed SABIC ZAMIL COOL CARE SABIC – HADEED Completed
60 Electrical Works Proving Services of Rental Generator for the Construction work inside Hadeed Steel Pant for ZAMIL Cool Care ZAMIL COOL CARE SABIC – HADEED Completed
61 Interior Works Complete Interior Works starting from demolition, tiling, gypsum work, painting works, glass works, carpentry works, structural work including CONE Frames & Tubing Works, shop fittings electrical works, HVAC works for the complete shop of “KOTTON” in DAHRAN MALL, AL KHOBAR for LAND MARK Group Mia Arabia Company CENTER POINT Completed
62 Interior Works Complete Interior Works starting from demolition, tiling, gypsum work, painting works, glass works, carpentry works, structural work including CONE Frames & Tubing Works, shop fittings electrical works, HVAC works for the complete shop of “KOTTON” in IBN, DAMMAM for LAND MARK Group Mia Arabia Company CENTER POINT Completed
63 Interior Works Complete Interior Works starting from demolition, tiling, gypsum work, painting works, glass works, carpentry works, structural work including CONE Frames & Tubing Works, shop fittings, HVAC works for the complete shop of “EMAX” in OTHAIM MALL – HOFUF , for LAND MARK Group Mia Arabia Company CENTER POINT Completed
64 Interior Works Complete Interior, Carpntary, Electrical, HVAC, Glass Works, Pluming Works, Painting & Finishing Works for BRAZILAN Restarant Jeddha Mia Arabia Company MIA HOLDING Completed
65 Interior Works Complete Interior, Carpntary, Electrical, HVAC, Glass Works, Pluming Works, Painting & Finishing Works for BRAZILAN Restaurant KHOABR Mia Arabia Company MIA HOLDING Completed
66 Interior Works Complete Interior Works, Tiling, gypsum work, painting works, glass works, carpentry works, structural work including all HVAC & Electrical works for the complete shop of “CityMAX” in LOLOAH MALL – Dammam, for LAND MARK Group Mia Arabia Company CENTER POINT Completed
67 Technical Services Technical Service Support for the Commissioning Activities for PWS Project at NPC Dammam SGS PWS GmbH for NPC Dammam Completed
68 Saudi KAD Contracting Company Supply and Installation  Equipment & Material for WUR
E & I work at FDHL 141, 143 & 148
Saudi KAD Aramco Completed
69 McDermott Supply and Construction of RT Bunker at MACL Dammam yard McDermott Aramco Completed
70 Petronash FZE Tightness test for 6 skids, Performing Hydro test with required manpower, tools, tackles, including pump, gauges, valves, hose and torque machine etc. at ARAMCO sites Petronash Aramco Completed

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

[/vc_column_text][/vc_column][/vc_row]