Summary of Completed Projects January 2018
# | Project Type | Project Details | Client Name | Status |
---|---|---|---|---|
1 | LPG SYSTEM | Detail Engineering, Supply & Fabrication of LPG Piping, Support Structure, Tank Platform, Installation of Complete Piping & LPG Tanks, Hydro test, Nitrogen Fitting & Pressurization, As Built Drawing, Co-Ordination with GASCO for the Engineering & Installation Approval & Certification and Commissioning of the System for AL BARAK Petrochemical, Yanbhu Through National Gas LLC of OMAN | National Gas | Completed |
2 | LPG SYSTEM | Engineering, Site Management, Co-ordination with Local Authorities for Approvals, Mechanical Electrical Including Piping for the LPG System with five 50 MT LPG tanks & complete Equipment including testing & commissioning in ARCELOR MITTAL Project in JUBAIL II, through NATIONAL GAS OF OMAN LLC | ARCELOR MITTAL | Completed |
3 | LPG SYSTEM | Engineering, Site Management, Co-ordination with Local Authorities for Approvals, Civil, Mechanical Electrical Including Piping for the LPG System with five 50 MT LPG tanks & complete Equipment including testing & commissioning in LPG Tank Project in Dammam II, through NATIONAL GAS OF OMAN LLC | Arab Steel | Completed |
4 | LPG SYSTEM | Construction of Industrial Gas Factory for Production of Industrial Gas 5000 Sq. meters from feasibility, engineering, construction, commissioning of the plant with set up for successfully operation, Technology Supplier National gas man SAOG, Client Middle East gas Factory | MIA Holding | Completed |
5 | HVAC | Instalaltion of HVAC Package Unit with Assocaited Piping Work, Duting Work, Supply & Instalaltion of VCD’s, Grills & Assocaited Equipments including Testign & Commissioning | SIEMENS | Completed |
6 | HVAC | Instalaltion of HVAC Package Unit with Assocaited Piping Work, Duting Work, Supply & Instalaltion of VCD’s, Grills & Assocaited Equipments including Testign & Commissioning | Land Mark Group | Completed |
7 | HVAC | Instalaltion of 25 Ton Package Unit, Duting Work, Supply & Installation of VCD’s, Grills Etc for the CITY MAX ARAR 2400 Sq. Meter | Land Mark Group | Completed |
8 | LPG SYSTEM | Detail Engineering, Supply & Fabrication of LPG Piping, Support Structure, Tank Platform, Installation of Complete Piping & LPG Tanks, Hydro test, Nitrogen Fitting & Pressurization, As Built Drawing, Co-Ordination with GASCO for the Engineering & Installation Approval & Certification and Commissioning of the System for AL BARAK Petrochemical, Yanbhu Through National Gas LLC of OMAN | National Gas | Completed |
9 | LPG SYSTEM | Engineering, Site Management, Co-ordination with Local Authorities for Approvals, Mechanical Electrical Including Piping for the LPG System with five 50 MT LPG tanks & complete Equipment including testing & commissioning in ARCELOR MITTAL Project in JUBAIL II, through NATIONAL GAS OF OMAN LLC | ARCELOR MITTAL | Completed |
10 | LPG SYSTEM | Engineering, Site Management, Co-ordination with Local Authorities for Approvals, Civil, Mechanical Electrical Including Piping for the LPG System with five 50 MT LPG tanks & complete Equipment including testing & commissioning in LPG Tank Project in Dammam II, through NATIONAL GAS OF OMAN LLC | Arab Steel | Completed |
11 | LPG SYSTEM | Construction of Industrial Gas Factory for Production of Industrial Gas 5000 Sq. meters from feasibility, engineering, construction, commissioning of the plant with set up for successfully operation, Technology Supplier National gas man SAOG, Client Middle East gas Factory | MIA Holding | Completed |
12 | HVAC | Instalaltion of HVAC Package Unit with Assocaited Piping Work, Duting Work, Supply & Instalaltion of VCD’s, Grills & Assocaited Equipments including Testign & Commissioning | SIEMENS | Completed |
13 | HVAC | Instalaltion of HVAC Package Unit with Assocaited Piping Work, Duting Work, Supply & Instalaltion of VCD’s, Grills & Assocaited Equipments including Testign & Commissioning | Land Mark Group | Completed |
14 | HVAC | Instalaltion of 25 Ton Package Unit, Duting Work, Supply & Installation of VCD’s, Grills Etc for the CITY MAX ARAR 2400 Sq. Meter | Land Mark Group | Completed |
15 | HVAC & Electrcal | HVAC & Electrical works in DAREN MALL DAMMAM concept BOSINI – LAND MARK Group | Land Mark Group | Completed |
16 | HVAC & Electrcal | HVAC & Electrical works in ALFANAR MALL AL KHOBAR concept BOSINI – LAND MARK Group | Land Mark Group | Completed |
17 | HVAC | Supply, Installation of complete Electro Mechanical Works for NDA Project , ZAMIL COOL CARE, SINOPEC – SAUDI KAYAN | ZAMIL COOL CARE | Completed |
18 | Mechanical | Construction of Chiller System with Chiller & Freezer including Engineering, Equipment Supply construction & complete commissioning MIA Holding in AL KHOBAR | MIA Holding | Completed |
19 | Mechanical | Complete Installation of DM Plant including construction engineering, supply of electrical construction materials, piping works, supply of control panel including soft ware development & commissioning, instrumentation works, complete power & control works, all mechanical installation works for DM plant in SAFCO, Sabic for Ion Exchange India Limited | ION Exchange | Completed |
20 | Mechanical | Fabrication & Supply of ACID measuring tank for DM Plant in SAFCO, SABIC for Ion Exchange India Limited | ION Exchange | Completed |
21 | Mechanical | Fabrication and Galvanizing Installation of Platform | ZAMIL COOL CARE | Completed |
22 | Mechanical | Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care (SHUT DOWN WORK ETS 03 VALVE CHAMBER (RFI # FGT – MECH- 020) | ZAMIL COOL CARE | Completed |
23 | Mechanical | Installation of FCU with Internal Piping, Fitting Installation, Equipment Installation, Valves & Fittings Installation & Testing inside HADEED Steel Plant for ZAMIL Cool Care ETS 05 FCU INSTALLATION & PIPING (RFI # FGT – MECH- 021) | ZAMIL COOL CARE | Completed |
24 | Mechanical | Installation of FCU with Internal Piping, Fitting Installation, Equipment Installation, Valves & Fittings Installation & Testing inside HADEED Steel Plant for ZAMIL Cool Care ETS 03 FCU INSTALLATION & PIPING (RFI # FGT – MECH- 024) | ZAMIL COOL CARE | Completed |
25 | Mechanical | Structural and Rest Room work as per Annexure City Max Arar | CENTER POINT | Completed |
26 | Mechanical | Installation of FCU with Internal Piping, Fitting Installation, Equipment Installation, Valves & Fittings Installation & Testing inside HADEED Steel Plant for ZAMIL Cool Care ETS 11 FCU INSTALLATION & PIPING (RFI # FGT – MECH- 026) | ZAMIL COOL CARE | Completed |
27 | Mechanical | Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care ( SHUT DOWN WORK ETS 03 TERTIARY AREA BYPASS LINE (RFI # FGT – MECH- 016)) | ZAMIL COOL CARE | Completed |
28 | Mechanical | Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant SHUT DOWN WORK AT DIFFERENT LOCATIONS | ZAMIL COOL CARE | Completed |
29 | Mechanical | Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant SHUT DOWN WORK AT DIFFERENT LOCATIONS | ZAMIL COOL CARE | Completed |
30 | Mechanical | Fabrication & Installation of Walk Ways, Platform & Ladders for the District Cooling Plant Equipment inside the Bldg & out side for ZAMIL District Cooling Plant inside Hadeed Steel plant, SABIC | ZAMIL COOL CARE | Completed |
31 | Mechanical | Construction of Panel room with SANDWITCH panels for the ETS Control Room inside Hadeed Steel Plant, ZAMIL Cool Care | ZAMIL COOL CARE | Completed |
32 | Mechanical | Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care ( ETS 13) | ZAMIL COOL CARE | Completed |
33 | Mechanical | Fabrication, Welding & Instalaltion of LPG Piping, Equipment Installation & Instalaltion of SNG system with realted electrical Power & Control Works | National Gas, OMAN | Completed |
34 | Mechanical | Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant for ZAMIL Cool care ( ETS 4-17-19-20) | ZAMIL COOL CARE | Completed |
35 | Mechanical | Fabrication, Welding & Instalaltion of Complete Piping for the Chillers & Accessories for Chillers for District Cooling Plant Expansion Project for ZAMIL COOL CARE, Hadeed, Sabic Jubail | ZAMIL COOL CARE | Completed |
36 | Mechanical works | various Electro Mechancial Worsk during the Plant Shut Down in Varios Porces Plant for HADEED EPM | HADEED EPM | Completed |
37 | Mechanical | Fabrication & Installation of Chilled Water Piping with Argon Welding, complete with FIT UP Welding & Installation at various facilities inside Hadeed Steel plant SHUT DOWN WORK AT DIFFERENT LOCATIONS | ZAMIL COOL CARE | Completed |
38 | Electrical works | Complete Electrical Work starting from construction Engineering, Cable Tray Installation, Conduit Installation, Cable Laying MV, LV, Control & Instrumentation, Cable Termination 34.5 KV (CONEX Termination), 13.8 KV, 4.16 KV, 480 Volts, control, Instrumentation & SCADA Works, Earthing Installation, Lighting Power & Sockets, Panel Installation, Transformer Installation, Cable Testing & Hipot Test up to 34.5 KV Cables, Control Cable Loop Checking, Complete works up to PSSR for Electrical, Control, SCADA for ZAMILL COOL CARE, District Cooling Plant Hadeed Steel Plant, SABIC | ZAMIL COOL CARE | Completed |
39 | Electrical works | Software Installation, Testing & Commissioning of RO plant for COCOCOLA Plant in Riyadh through ION Exchange India Limited | ION Exchange | Completed |
40 | Electrical works | Cable Tray Work, Conduit Installation, Cable Laying, Termination, for HVAC SEC Project in Royal Commission for ZAMIL COOL CARE | ZAMIL COOL CARE | Completed |
41 | Electrical works | Cable Tray Work, Conduit Installation, Cable Laying & Termination for Incoming Cable for Energy Transfer Station, ZAMIL District Cooling Plant, HADEED Steel Plant, SABIC – EST 08 | ZAMIL COOL CARE | Completed |
42 | Electrical works | Supply & Commissioning of Power & Control panel with PLC & software program for the DM Plant in SAFCO for ION Exchange India Limited | ION Exchange | Completed |
43 | Electrical works | Complete Electrical Works including Cable Tray Work, Conduit Installation, Cable laying, Panel Installation, Cable Laying, Termination, Instrument Works, Lighting Works, Earthing Installation, Testing of Cables, Loop Checking, Earth Testing, Illumination Test, PSSR all activities for Electrical Power, Control & Instrumentation PSSR for HVAC SYSTEM, ZAMIL COOL CARE for SAUID KAYAN, JUBAIL | ZAMIL COOL CARE | Completed |
44 | Electrical works | Complete Electrical Works including Cable Tray Work, Conduit Installation, Cable laying, Panel Installation, Cable Laying, Termination, Instrument Works, Lighting Works, Earthing Installation, Testing of Cables, Loop Checking, Earth Testing, Illumination Test, PSSR all activities for Electrical Power, Control & Instrumentation PSSR for HVAC SYSTEM, ZAMIL COOL CARE for SAUID KAYAN, JUBAIL | ZAMIL COOL CARE | Completed |
45 | Electrical works | Cable Tray Installation, Conduit Installation, Equipment Installation, Cable Laying & Termination for the CCTV & Accesses Control System in MADEN Project in ARAR for THALES | TORQUE | Completed |
46 | Electrical works | Complete Electrical Works including Cable Tray Work, Conduit Installation, Cable laying, Panel Installation, Cable Laying, Termination, Instrument Works, Lighting Works, Earthing Installation, Testing of Cables, Loop Checking, Earth Testing, Illumination Test, PSSR all activities for Electrical Power, Control & Instrumentation PSSR for Energy Transfer Station, ZAMIL COOL CARE for HADEED District Cooling Plant, Hadeed, SABIC. ( ETS 18) | ZAMIL COOL CARE | Completed |
47 | Electrical works | Testing of ETS Incoming Panel – ZAMIL for District Cooling Plant, Hadeed SABIC | ZAMIL COOL CARE | Completed |
48 | Electrical works | Proving Services of Rental Generator for the Construction work inside Hadeed Steel Pant for ZAMIL Cool Care | ZAMIL COOL CARE | Completed |
49 | Interior Works | Complete Interior Works starting from demolition, tiling, gypsum work, painting works, glass works, carpentry works, structural work including CONE Frames & Tubing Works, shop fittings electrical works, HVAC works for the complete shop of “KOTTON” in DAHRAN MALL, AL KHOBAR for LAND MARK Group | CENTER POINT | Completed |
50 | Interior Works | Complete Interior Works starting from demolition, tiling, gypsum work, painting works, glass works, carpentry works, structural work including CONE Frames & Tubing Works, shop fittings electrical works, HVAC works for the complete shop of “KOTTON” in IBN, DAMMAM for LAND MARK Group | CENTER POINT | Completed |
51 | Interior Works | Complete Interior Works starting from demolition, tiling, gypsum work, painting works, glass works, carpentry works, structural work including CONE Frames & Tubing Works, shop fittings, HVAC works for the complete shop of “EMAX” in OTHAIM MALL – HOFUF , for LAND MARK Group | CENTER POINT | Completed |
52 | Interior Works | Complete Interior Works starting from demolition, tiling, gypsum work, painting works, glass works, carpentry works, structural work including CONE Frames & Tubing Works, shop fittings electrical works, HVAC works for the complete shop of “KOTTON” in MARINA MALL, DAMMAM, for LAND MARK Group | CENTER POINT | Completed |
53 | Interior Works | Complete Interior, Carpntary, Electrical, HVAC, Glass Works, Pluming Works, Painting & Finishing Works for BRAZILAN Restarant Jeddha | MIA HOLDING | Completed |
54 | Interior Works | Complete Interior, Carpntary, Electrical, HVAC, Glass Works, Pluming Works, Painting & Finishing Works for BRAZILAN Restaurant KHOABR | MIA HOLDING | Completed |
55 | Interior Works | Complete Interior Works, Tiling, gypsum work, painting works, glass works, carpentry works, structural work including all HVAC & Electrical works for the complete shop of “CityMAX” in LOLOAH MALL – Dammam, for LAND MARK Group | CENTER POINT | Completed |
56 | O & M | Operation & Maintenance for the District Cooling Plant, ZAMIL, HADEED, SABIC | ZAMIL COOL CARE | Completed |
57 | HVAC | Supply, Installation & Commissioning assistance for 380 KV Substation HVAC system for SEC in SAFANIYA for ZAMIL Cool care including Square Ducting, Spiral Ducting, Other Equipment except HVAC Unit & DDC panel complete electrical, mechanical & ducting | ZAMIL COOL CARE | Completed |
58 | Const. | Complete Construction from Engineering/ Coordination & Approval and complete construction of 4800 Sq. Meter Brasa De Brazil Restaurant in Jubail under Royal Commission Civil, Structural, Electrical, Mechanical, HVAC & Interior | MIA Holding | Completed |
59 | Const. | Complete Renovation /Expansion of from Engineering/ Coordination & Approval and complete construction of 950 Sq. Meter Taya Restaurant in AL KHOBAR including Civil, Structural, Electrical, Mechanical, HVAC & Interior | MIA Holding | Completed |
60 | HVAC | Replacement of AHU in Billet Caster Plant Hadeed | ZAMIL COOL CARE | Completed |
61 | Electrical Works | Supply & Instalaltion of Power & Control Incldign Cable Tray Work, Conduit Work, Cable Laying, Termination, Instrument Instalaltion for 30 Diffrenet Building in WASIT gas Plant ARAMCO | ZAMIL COOL CARE | Completed |
62 | HVAC Works | Complete Electro Mechanical Works for the HVAC in Varios Building including supply of Dut & Duct accessories, istallation of all equipment, ducts & duct accessories, electrical works power & control for SIPCHM, UDHAY Arabia Proejct | ZAMIL COOL CARE | Completed |
63 | Electrical Works | Supply & Instalaltion of HVAC Power & Control Incldign Cable Tray Work, Conduit Work, Cable Laying, Termination, Instrument Instalaltion for 4 Diffrenet Building in SADARA L & T Proejct | ZAMIL COOL CARE | Completed |
64 | Civil Works | Cvil Works for the ETS Room Construction, Duct Banks, Fighting Fightign Pipe Line Foundations in Hadeed Steel Plant | ZAMIL COOL CARE | Completed |
65 | Danieli & C, Italy | Mechanical, Electrical, Instrumentation Piping installation works for HADEED Bar Mill no 2 for RM-LP2 | March 2017 | Completed |
66 | Saudi KAD Contracting Company | Execution of string, Fit up, welding, installation, NDT/RT, Air Cleaning, hydrotesting, lowering of pipeline in the trench of 12”trunkline | March 2017 | Completed |
67 | Saudi KAD Contracting Company | Supply and Installation Equipment & Material for WUR E & I work at KRSN 133, 134 & 128 | March 2017 | Completed |
68 | Saudi KAD Contracting Company | Supply and Installation Equipment & Material for WUR E & I work at FDHL 141, 143 & 148 | March 2017 | Completed |
69 | McDermott | Supply and Construction of RT Bunker at MACL Dammam yard | June 2017 | Completed |
70 | Petronash FZE | Tightness test for 6 skids, Performing Hydro test with required manpower, tools, tackles, including pump, gauges, valves, hose and torque machine etc. at ARAMCO sites | May 2017 | Completed |